1. Check and confirm the acceptance of the foundation of the lower part of the precipitator before installation. Install the components of the electrostatic precipitator according to the requirements of the "Installation Instructions for Electrostatic Precipitator" and the design drawings, and determine the center of the electrostatic precipitator according to the basis of confirmation and acceptance. Benchmark and serve as the installation benchmark for cathode and anode systems.
2. Vérifiez la planéité, la distance entre les colonnes et l'erreur diagonale du plan de base
3. Check the shell parts, correct the transportation deformation, and install them layer by layer from bottom to top, such as the support group—the bottom beam (the ash hopper and the electric field internal walking platform are installed after passing the inspection)—the column and the side wall plate—the top beam— Air inlet and outlet (including distribution plate and trough plate) - cathode and anode system - top cover plate - high voltage power supply and other equipment. Ladders, platforms and railings can be installed layer by layer according to the installation sequence. After each layer is installed, it must be checked and recorded in accordance with the requirements of the "Electrostatic Precipitator Installation Instructions" and design drawings: such as flatness, diagonal, column spacing, verticality After the installation of , pole distance, etc., the air-tightness inspection of the equipment is carried out, and repair welding is carried out for the missing welding parts, inspection, and repair welding for the missing welding parts.